FIELD NOTE / TIKTOK
Find start and cancel.
The short film, the complete written thought, and the evidence behind it.
The TikTok conversation link will follow its public release.
Find start and cancel.
Day 105 - 2027-01-10 PT target - TikTok
Video caption
Find start and cancel. Date stamp stays in the sentence. IDE host versus product driver. Prefer additive surfaces. Narration uses Eric's authorized AI voice clone. #EricFieldNotes
Full written post / accessibility read
I look at a candidate agent API and search for start job, stream progress, continue, cancel, and artifact collection. If those are missing, I am holding a model client, not a product to harness job contract.
Whenever I say UHP in a review, I say draft September twelfth twenty twenty six. That habit stops people from treating a draft as a shipped interchange standard.
If the discussion is IDE plug-in, I label ACP shaped concerns. If the discussion is product driven jobs, I label UHP shaped concerns. Coexistence stays untested until measured.
I still ship responses compatible task surfaces that align with the job shape. That is practical without pretending the conformance suite already exists.
Narration uses Eric's authorized AI voice clone.
#EricFieldNotes
Four-beat scene transcript
1. Find start and cancel.
I look at a candidate agent API and search for start job, stream progress, continue, cancel, and artifact collection. If those are missing, I am holding a model client, not a product to harness job contract.
Visual: If missing, you only have a model client.
2. Mark draft when naming UHP.
Whenever I say UHP in a review, I say draft September twelfth twenty twenty six. That habit stops people from treating a draft as a shipped interchange standard.
Visual: Date stamp stays in the sentence.
3. Separate ACP questions.
If the discussion is IDE plug-in, I label ACP shaped concerns. If the discussion is product driven jobs, I label UHP shaped concerns. Coexistence stays untested until measured.
Visual: IDE host versus product driver.
4. Prefer additive surfaces.
I still ship responses compatible task surfaces that align with the job shape. That is practical without pretending the conformance suite already exists.
Visual: Do not wait forever on a suite.