JournalDAY 105 / TIKTOK

FIELD NOTE / TIKTOK

Find start and cancel.

The short film, the complete written thought, and the evidence behind it.

Journal September 28, 2026 · TikTok target January 10, 2027
Open the approved MP4 ↗

The TikTok conversation link will follow its public release.

Find start and cancel.

Day 105 - 2027-01-10 PT target - TikTok

Video caption

Find start and cancel. Date stamp stays in the sentence. IDE host versus product driver. Prefer additive surfaces. Narration uses Eric's authorized AI voice clone. #EricFieldNotes

Full written post / accessibility read

I look at a candidate agent API and search for start job, stream progress, continue, cancel, and artifact collection. If those are missing, I am holding a model client, not a product to harness job contract.

Whenever I say UHP in a review, I say draft September twelfth twenty twenty six. That habit stops people from treating a draft as a shipped interchange standard.

If the discussion is IDE plug-in, I label ACP shaped concerns. If the discussion is product driven jobs, I label UHP shaped concerns. Coexistence stays untested until measured.

I still ship responses compatible task surfaces that align with the job shape. That is practical without pretending the conformance suite already exists.

Narration uses Eric's authorized AI voice clone.

#EricFieldNotes

Four-beat scene transcript

1. Find start and cancel.

I look at a candidate agent API and search for start job, stream progress, continue, cancel, and artifact collection. If those are missing, I am holding a model client, not a product to harness job contract.

Visual: If missing, you only have a model client.

2. Mark draft when naming UHP.

Whenever I say UHP in a review, I say draft September twelfth twenty twenty six. That habit stops people from treating a draft as a shipped interchange standard.

Visual: Date stamp stays in the sentence.

3. Separate ACP questions.

If the discussion is IDE plug-in, I label ACP shaped concerns. If the discussion is product driven jobs, I label UHP shaped concerns. Coexistence stays untested until measured.

Visual: IDE host versus product driver.

4. Prefer additive surfaces.

I still ship responses compatible task surfaces that align with the job shape. That is practical without pretending the conformance suite already exists.

Visual: Do not wait forever on a suite.

More notes from the work ↗